We scope every project with a site assessment: base condition, drainage gradient, and surface system integrity are all checked before a recommendation is made. A track that looks worn on top may have a structurally sound asphalt base that supports resurfacing; one with base cracking or drainage failure underneath needs more than a new topcoat to perform correctly.
New builds follow a full sequence, site grading, asphalt or concrete base preparation, drainage system installation, and surface system application. Polyurethane and tartan synthetic surfaces have different installation requirements and performance characteristics, and the right choice depends on the track’s intended use, traffic volume, and local climate conditions.
Lane marking and runoff area finishing complete the build. The written estimate breaks out base preparation, surface system, drainage, and line marking as separate items, so schools, clubs, and facility managers can see exactly what each stage costs before the local court builder begins work.