We scope every build with an on-site evaluation: site measurement, slope check, and a ground condition review to determine whether a concrete slab, asphalt base, or compacted sub-base is the right foundation. Soft or uneven ground that is not corrected at this stage causes surface cracking and uneven bounce within a few years.
The local court builder carries out base compaction, surface pour or modular tile installation, and acrylic or polymer surfacing once the base is confirmed. A standard residential half court runs 30 x 50 ft, but the layout is confirmed against your available space and any local setback requirements before work starts.
Regulation line striping and hoop mounting are the final steps, with anchor depth and backboard alignment checked before the project is closed. The written estimate breaks out each stage, base preparation, surfacing, line marking, and equipment placement, so every cost is visible before the first shovel goes in.